Sunday, October 27, 2013

Kitchen Progress, A Sneak Peek.

While I was still recovering from having Luke, Walter took on the project of the kitchen floor.  I helped some with the uncut tiles, but he finished up with the tiles that needed cutting and then did the grouting and sealing.  We decided to use laminate stick-on tiles that are groutable.  Since we want to do a full kitchen reno sometime in the future we didn't want to invest too much time or money into these floors.  But the old floors were pretty ugly, so we wanted to do something.  
Walter did a great job!  The whole room looks so much better!  We still need to finish it off with quarter-round and put up the bead-board in the kitchen, so I'll do a full before-and-after when we have that done.

Well, that didn't take long...

Compliments of Bart.